
Construction time£º2020 Completion time£º2021 Project area: 205,000©O Volume of steel£º3400t
Project description£ºCapacity: 82,000 seats; Retractable roof area: 6,000t; String truss and space frame structure; Intergral lifting: 4,400t weight and 60m height; Work scope: shop drawing, fabrication, erection of steel structure and retractable roof system.
Bright spot£ºRetractable roof stadium